Skip to content
Hearth & Form

Costs & Budgeting

How Much Does a Home Renovation Cost in Singapore? A Straight Answer by Property Type

Renovation costs in Singapore are quoted everywhere and explained almost nowhere. Here is where the money actually goes — and how to budget so the numbers hold.

Hearth & Form · 25 August 2026 · 8 min read

Kitchen with timber cabinetry, white island and wooden stools

The short answer

Market surveys put typical full-home renovations in Singapore at roughly S$50k–60k for a 4-room BTO, S$60k–75k for a 5-room, and S$70k–100k for resale flats of similar size — with resale costing more due to hacking and re-wiring. Carpentry is the largest single line, typically 30–40% of the total. (Ranges cited from Qanvast's 2026 survey of Singapore renovations; your scope decides where you land within it.)

Market ranges, honestly cited

Third-party survey data gives useful medians — but your scope, not the median, sets your number. Treat ranges as orientation, not quotation.

*Ranges from Qanvast's 2026 survey of Singapore renovation projects (BTO: 341 projects; resale: 449 projects), rounded for readability. They describe the market, not any single project — a scope-led quotation is the only number worth planning around.

Property typeTypical market range*Why
3-room BTOS$40k – 52kLess carpentry volume, one bath
4-room BTOS$50k – 60kStandard full scope: kitchen, wardrobes, both baths
5-room BTO / ECS$60k – 76kMore carpentry area, larger living zones
4-room resaleS$70k – 82kAdds hacking, re-wiring, re-plumbing
5-room resaleS$80k – 99kOlder pipes and floors, bigger areas
Condo (3-bed)S$70k – 100k+Finishes level, MCST constraints

Where the money actually goes

Carpentry dominates — typically the largest single line at 30–40% of a full renovation — followed by wet-area works (bathrooms and kitchen), then hacking and flooring, then electrical and lighting, then painting and finishing.

Line itemShare of budgetNotes
Carpentry30–40%Kitchen, wardrobes, storage — internals matter more than fronts
Bathrooms10–15% eachWaterproofing and re-laying drive cost, not fittings
Kitchen (non-carpentry)8–12%Countertop, appliances, sink and taps
Hacking & flooring10–18%Resale flats: expect the higher end
Electrical & lighting8–12%Wiring, DB upgrade, fittings
Painting & finishing5–8%Quality shows here more than anywhere

What moves a budget up or down

Three levers decide most budgets: how much carpentry you build, whether floors get hacked or overlaid, and the finish level of kitchens and bathrooms.

  • Carpentry scope — each additional full-height wall of built-ins is real money; prioritise by daily use
  • Overlay vs hack — overlay saves significantly and shortens the schedule; hacking resets everything (sometimes necessarily)
  • Stone choices — natural stone and imported sintered stone sit well above quartz and granite
  • Bathroom count — a second re-laid bathroom is one of the biggest single additions to resale budgets
  • Lighting — modest cost, outsized result; never the place to save first

The buffer every budget needs

Plan a 10–20% contingency. In resale flats, hidden conditions — floor levels, ageing pipes, waterproofing failure — are discovered during works, not before them.

A contingency is not a slush fund; it is the honest price of not knowing what's under the tiles. Well-documented projects spend it deliberately; undocumented ones spend it chaotically. Ask any contractor you're interviewing how variations are priced and documented — the answer tells you a lot.

How we quote (and how to compare quotations)

Insist on a line-item quotation mapped to drawings. Comparing three quotations line by line is the only way to compare like with like — package quotes hide exactly the details that decide your budget.

When you receive our quotation after design development, every line maps to a drawing or specification: carpentry by unit with internals listed, works by area, fittings by model. When comparing with other quotations, match line to line — differences you find are either scope, quality or margin. All three are worth knowing.

Common questions

Is it cheaper to renovate a BTO or a resale flat?

BTOs are almost always cheaper for the same scope: no hacking of old floors, newer wiring and pipes, and no surprises behind 30-year-old tiles. Resale budgets should assume a premium for the unglamorous works.

Can I renovate for under S$30k?

For a light-refresh scope — painting, lighting, one or two carpentry pieces, furniture — yes. A full-home renovation with kitchen and bathrooms at that budget means significant compromises; we'll tell you honestly what S$30k realistically covers.

When do I pay?

Payment schedules vary by company; ours is stated plainly in the quotation and tied to milestones, not calendar dates. Confirm any company's schedule — and what protects your deposits — before signing.

References

Relevant services

Call WhatsApp